There was an inital requirement for a deep excavation on a sea wall – 30m x 15m x 4m. This was in order to expose existing whaling beams and then to replace them. Vac ex/Brok was utilised for the excavations, we then replace the beams and capped with concrete, followed by filling the area with over 2000t of type one, compacted every 300mm.
Copyright Force Contracting Services Ltd 2024 | Cookie Policy | Website by Castle Creativity