Working on behalf of Amco Giffen, Force Rail completed the installation of Kingpost Piles for embankment retention for new LOC bases on the WAH and SHL lines north of Hereford.
Contracted to install a number of 5m long 152 x 152 x 30 H-Piles at two locations, this work was undertaken using an excavator with an EMV piling hammer attachment to achieve circa 2m embedment into mudstone.
Force Rail were asked to price some piling works to LOC bases. They were able to provide a competitive price in good time. When our works were impacted by weather, Force Rail were able to adapt to new programmes with minimal fuss and went out of their way to ensure that our works were complete in time for a key client commissioning. Documentation provided was of a good standard and the site teams arrived with a positive attitude. They completed their works in a safe manner and inside of the agreed programme with a high quality finish. I look forward to working with Force Rail again in the future.