Initially, we removed the top 450mm of the bridge deck, in preparation for the new surface to be laid. Once this once completed, we mass poured over 100m3 of reinforced concrete to a power floated finish. This was finished with polysulphide jointing sealant which acted as a bridge between the 3 completed sections.
Next, we then built of the adjacent parapets to a nominal height along the length of the bridge deck. This was then completed with GRP coping stones along the length of the deck.
As a result of Force’s dedication to safety and attention to detail throughout the course of this project, JMS awarded us the Pride in Safety and Welfare Standards.