The piling works are for a level crossing renewals project as part of a Network Rail safety upgrade initiative, we were contracted to install 21No. 114mm diam. x 10mm thick x 8m long Helical screw piles with a 60kNm torque-head attachment; with an installation torque rate of between 15 and 25kNm of torque, with safe working loads of 70kN Compression, 40kN Tension and 5kN Lateral.